UPS系统-系统部分PILLER
Uniblock UB-V 1500
UPS系统-系统部分
PILLER
Uniblock UB-V 1500
製造年份
2002
狀況
二手
位置
Leipzig 

顯示圖片
显示地图
机器数据
价格和位置
- 位置:
- Messe-Allee 10a, 04158 Leipzig, Deutschland

撥打
优惠详情
- 產品ID:
- A17684048
- 參考編號:
- 1087-1400019
- 最後更新:
- 於 09.05.2025
描述
Technical details:
rated capacity: 1670 kVA
rated capacity: 1500 KW
voltage: 400 / 50 V / Hz
Number of working hours: 800 h
This UPS system is ideal for fault-free operation under the demanding environmental conditions that can occur in industrial applications.
Suitable for stabilizing mains systems, for example.
The UPS system consists of the Powerbridge (a flywheel mass with attached generator) and a Uniblock (electric motor/generator block).
The Uniblock supplies the power for the customer modules without grid faults.
The Powerbridge serves as energy storage.
In the event of a mains failure, the Powerbridge briefly takes over the power supply (at full load, the power supply is maintained for 39 seconds).
Energy storage unit type PB60+ with bridging time 39sec.
A diesel engine is connected via an overrunning clutch. This means that as soon as the engine has reached the speed of the Unibklock, it pulls the generator up to the synchronous speed and thus takes over the power supply.
At the same time, the Powerbridge is supplied with energy again.
Csdpfxsu Nzwus Ab Eogn
*
rated capacity: 1670 kVA
rated capacity: 1500 KW
voltage: 400 / 50 V / Hz
Number of working hours: 800 h
This UPS system is ideal for fault-free operation under the demanding environmental conditions that can occur in industrial applications.
Suitable for stabilizing mains systems, for example.
The UPS system consists of the Powerbridge (a flywheel mass with attached generator) and a Uniblock (electric motor/generator block).
The Uniblock supplies the power for the customer modules without grid faults.
The Powerbridge serves as energy storage.
In the event of a mains failure, the Powerbridge briefly takes over the power supply (at full load, the power supply is maintained for 39 seconds).
Energy storage unit type PB60+ with bridging time 39sec.
A diesel engine is connected via an overrunning clutch. This means that as soon as the engine has reached the speed of the Unibklock, it pulls the generator up to the synchronous speed and thus takes over the power supply.
At the same time, the Powerbridge is supplied with energy again.
Csdpfxsu Nzwus Ab Eogn
*
这些广告您可能也感兴趣。
小广告
Rimini
7,457 km
发电机
ERCOLE MARELLI1312T
ERCOLE MARELLI1312T
小广告
Wiefelstede
7,268 km
发电机 730 kVA
MWM/PillerNKTB 4-1158
MWM/PillerNKTB 4-1158
小广告
Kreuztal
7,393 km
液压四辊锥形圆弯曲机
SAHINLER1050 x 70/185 x 4 mm
SAHINLER1050 x 70/185 x 4 mm
小广告
Sevenum
7,489 km
自动 1 头 ROPP 封盖机
BertolasoAlfa 110-VH40
BertolasoAlfa 110-VH40
小广告
Hürth
7,466 km
粉末涂料厂。提供
Romer Spark
Romer Spark
小广告
Bydgoszcz
6,676 km
中心车床
PontiggiaNH 500/8M
PontiggiaNH 500/8M
小广告
Whanganui
11,123 km
储存升降机
Kardex RemstarXP500 Shuttle
Kardex RemstarXP500 Shuttle
小广告
Wuppertal
7,428 km
织带机 4/42mm
Jakob Müller Frick AGNF42 4/42mm
Jakob Müller Frick AGNF42 4/42mm
小广告
Goldenstedt
7,273 km
叉式装卸车-电
CARERZ 25 HD
CARERZ 25 HD
您的广告已成功删除
发生错误










































































































