CHP 工厂 Capstone C1000 + APROVISCapstone
C1000
CHP 工厂 Capstone C1000 + APROVIS
Capstone
C1000
出厂年份
2015
状况
二手
位置
Laško 

基本数据
价格和位置
- 位置:
- Laško, 斯洛文尼亚

拨打
技术细节
发动机和变速箱
燃料:
家用燃气 H
功率详情
输入电压:
400 V
输入频率:
50 赫兹
输入电流:
1,444 A
输入电流类型:
三相
文件和认证
文档 / 手册
冷却
冷却类型:
空气
更多详细信息
额定(视在)功率:
999 千伏安
最大转速:
60,000 转/分
优惠详情
- 广告编号:
- A22903560
- 参考编号:
- SPTE-C1000
- 更新:
- 最近更新时间为 08.10.2026
描述
Used natural gas-fired combined heat and power plant for electricity and industrial steam production.
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Dsdjz I T Ekopfx Am Djku
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
该广告为自动翻译,可能存在翻译错误。
Main equipment:
• Capstone C1000: five C200 microturbine modules, each rated at 200 kW; electrical output of the complete package: 999 kWe; 400 V / 50 Hz; grid-parallel operation; common acoustic enclosure and control system.
• APROVIS waste heat steam boiler: rated production of 2,000 kg/h of saturated steam at 6 bar(g); maximum allowable pressure 9 bar(g); equipped with two economizer stages for heat recovery.
Dsdjz I T Ekopfx Am Djku
• Reinhard Simon CKO501G supplementary duct burner: 500 kW, for additional exhaust gas heating upstream of the boiler.
• BIO-KOMP fuel gas booster compressor: 30 kW, maximum flow 340 Nm³/h, discharge pressure 6 bar(g).
The plant has been regularly maintained under a maintenance contract, with components replaced in accordance with the maintenance schedule. One of the five turbine modules is currently non-operational.
Operating hours: T1: 53,191 h; T2: 50,891 h; T3: 51,628 h; T4: 52,691 h; T5: 49,487 h.
The pressure equipment has an inspection certificate issued by an accredited pressure equipment inspection body. Technical documentation is available. Inspection, price and collection terms are subject to agreement.
该广告为自动翻译,可能存在翻译错误。
供應商
注意: 免费注册或登录,以获取所有信息。
上次在线:上周
注册于: 2025
2 在线广告
发送询价
电话 & 传真
+386 51 2... 广告
您的广告已成功删除