Ansaldo Energia power plant consist of 2 units - Each unit 285 MW ( CCPP )
Ansaldo Energia - 2 x 285 MW CCPP
Working hours - ZERO
2 x 285 MW Ansaldo Energia , Combined Cycle Power Plants .
Ansaldo Energia Gas turbine model AE94.2
YOM: 2017
Hours: 0
Frequency: 50 Hz
Power of Gas turbine generator: 185 MW
Gas Turbine generator model: QF-180-2
Gas turbine generator workers:Shanghai Electric
Gas turbine generator voltage: 18 KV
Steam turbine workers: Shanghai Electric
Steam turbine generator: QF-100-2
Steam turbine generator output: 100 MW
Steam turbine generator worker: Shanghai Electirc
Steam turbine generator voltage: 10.5 KV
HRSG workers: Hangzhou Boiler Factory
HRSG model: NG-AE94.2-R
HRSG output steam: 241.1t/h
Hodox Tcinspfx Aaxeng
HRSG temperature: 517°C
HRSG max.Pressure: 8.89MPA.G
Heat rate of CCCP: 52% to 53%
Scope of suppy:
Turbine + Alternator + Cooler + Lube + Added Gas + Water treament + Steam tank + steam turbine(100mw+18mw) + HRSG + Steam turbine alternator + Chimney + Tube + Fire fighter + transformer + Control + High volt cabine + low volt cabine + mcc + Hv comp art
IT IS COMPLETED POWER PLANT !
Ansaldo Energia - 2 x 285 MW CCPP
Working hours - ZERO
2 x 285 MW Ansaldo Energia , Combined Cycle Power Plants .
Ansaldo Energia Gas turbine model AE94.2
YOM: 2017
Hours: 0
Frequency: 50 Hz
Power of Gas turbine generator: 185 MW
Gas Turbine generator model: QF-180-2
Gas turbine generator workers:Shanghai Electric
Gas turbine generator voltage: 18 KV
Steam turbine workers: Shanghai Electric
Steam turbine generator: QF-100-2
Steam turbine generator output: 100 MW
Steam turbine generator worker: Shanghai Electirc
Steam turbine generator voltage: 10.5 KV
HRSG workers: Hangzhou Boiler Factory
HRSG model: NG-AE94.2-R
HRSG output steam: 241.1t/h
Hodox Tcinspfx Aaxeng
HRSG temperature: 517°C
HRSG max.Pressure: 8.89MPA.G
Heat rate of CCCP: 52% to 53%
Scope of suppy:
Turbine + Alternator + Cooler + Lube + Added Gas + Water treament + Steam tank + steam turbine(100mw+18mw) + HRSG + Steam turbine alternator + Chimney + Tube + Fire fighter + transformer + Control + High volt cabine + low volt cabine + mcc + Hv comp art
IT IS COMPLETED POWER PLANT !