Complete Power Plant, Full CHP Plant Wood Chip Heating / Thermal Oil System VAS 6MW Thermal + 1.1MW Electrical Output
The plant was originally built in 2003 & 2004. Major components such as the thermal oil heater and hot water ECO were entirely replaced in 2012.
Components:
- Walking floor
- Hydraulic feed
- VAS combustion chamber
- VAS thermal oil heater
- Hot water ECO
- Dedusting (coarse and fine dust removal)
- Ash removal by chain conveyor
- Exhaust gas path incl. fans and chimney system
- Turboden ORC module with 1.1MW electrical output
- Complete plant control with visualization
Including units, pumps, and valves
Including thermal oil pumps
Including thermal oil
Including all accessories required for operation
The plant is being sold because a larger plant with significantly higher capacity has been built nearby. The walls and roof of the boiler house can also be included if required.
Pgedpsvytfuofx Ai Ijw
Remaining thermal output in operation with Turboden ORC module: 5MW
Electrical output ORC module: 1.1MW
Fuel consumption approx. 9 loose cubic meters per hour (depending on fuel)
Dismantling must be carried out by the buyer.
Further information on request.
该广告为自动翻译,可能存在翻译错误。
The plant was originally built in 2003 & 2004. Major components such as the thermal oil heater and hot water ECO were entirely replaced in 2012.
Components:
- Walking floor
- Hydraulic feed
- VAS combustion chamber
- VAS thermal oil heater
- Hot water ECO
- Dedusting (coarse and fine dust removal)
- Ash removal by chain conveyor
- Exhaust gas path incl. fans and chimney system
- Turboden ORC module with 1.1MW electrical output
- Complete plant control with visualization
Including units, pumps, and valves
Including thermal oil pumps
Including thermal oil
Including all accessories required for operation
The plant is being sold because a larger plant with significantly higher capacity has been built nearby. The walls and roof of the boiler house can also be included if required.
Pgedpsvytfuofx Ai Ijw
Remaining thermal output in operation with Turboden ORC module: 5MW
Electrical output ORC module: 1.1MW
Fuel consumption approx. 9 loose cubic meters per hour (depending on fuel)
Dismantling must be carried out by the buyer.
Further information on request.
该广告为自动翻译,可能存在翻译错误。
供應商
注意: 免费注册或登录,以获取所有信息。
注册于: 2023
5 在线广告
发送询价
电话 & 传真
+43 5516 ... 广告
这些广告您可能也感兴趣。
成功
您的消息已发送。
小广告
Strenči
6,063 km
圆形工件磨床
BRUSA & GARBOLILT 130
BRUSA & GARBOLILT 130
成功
您的消息已发送。
小广告
Hamburg
7,141 km
VFFS 线
AMTECVFFS-SYS AF 45-XL ECO
AMTECVFFS-SYS AF 45-XL ECO
成功
您的消息已发送。
小广告
Thisted
7,049 km
卧式水箱16m3
Holmskov Rustfri A/SW4404
Holmskov Rustfri A/SW4404
成功
您的消息已发送。
小广告
Jonava
6,214 km
干燥设备
PROLAINCDK-170-9-36
PROLAINCDK-170-9-36
成功
您的消息已发送。
小广告
Pesaro
7,447 km
HM 锯双面磨床
VOLLMERCEF250
VOLLMERCEF250
成功
您的消息已发送。
小广告
Karsin
6,647 km
木托盘削片机 XH 1250
wood chipperXH 1250
wood chipperXH 1250
成功
您的消息已发送。
小广告
Kežmarok
6,674 km
指接线
GreConProfiJoint PJ7/6100-LI
GreConProfiJoint PJ7/6100-LI
成功
您的消息已发送。
小广告
Timișoara
6,762 km
宽刨床
Kupfermühle 800 MM
Kupfermühle 800 MM
成功
您的消息已发送。
小广告
德国
7,232 km
烘干机
Cremona
Cremona
成功
您的消息已发送。
小广告
德国
7,431 km
用1个轮廓辊进行涂胶指接
DIMTERErsatzteile und Zubehör dimter
DIMTERErsatzteile und Zubehör dimter
您的广告已成功删除
发生错误