Complete Power Plant, Full CHP Plant Wood Chip Heating / Thermal Oil System VAS 6MW Thermal + 1.1MW Electrical Output
The plant was originally built in 2003 & 2004. Major components such as the thermal oil heater and hot water ECO were entirely replaced in 2012.
Components:
- Walking floor
- Hydraulic feed
- VAS combustion chamber
- VAS thermal oil heater
- Hot water ECO
- Dedusting (coarse and fine dust removal)
- Ash removal by chain conveyor
- Exhaust gas path incl. fans and chimney system
- Turboden ORC module with 1.1MW electrical output
- Complete plant control with visualization
Including units, pumps, and valves
Including thermal oil pumps
Including thermal oil
Including all accessories required for operation
The plant is being sold because a larger plant with significantly higher capacity has been built nearby. The walls and roof of the boiler house can also be included if required.
Remaining thermal output in operation with Turboden ORC module: 5MW
Hnjdpfevytfusx Amvot
Electrical output ORC module: 1.1MW
Fuel consumption approx. 9 loose cubic meters per hour (depending on fuel)
Dismantling must be carried out by the buyer.
Further information on request.
该广告为自动翻译,可能存在翻译错误。
The plant was originally built in 2003 & 2004. Major components such as the thermal oil heater and hot water ECO were entirely replaced in 2012.
Components:
- Walking floor
- Hydraulic feed
- VAS combustion chamber
- VAS thermal oil heater
- Hot water ECO
- Dedusting (coarse and fine dust removal)
- Ash removal by chain conveyor
- Exhaust gas path incl. fans and chimney system
- Turboden ORC module with 1.1MW electrical output
- Complete plant control with visualization
Including units, pumps, and valves
Including thermal oil pumps
Including thermal oil
Including all accessories required for operation
The plant is being sold because a larger plant with significantly higher capacity has been built nearby. The walls and roof of the boiler house can also be included if required.
Remaining thermal output in operation with Turboden ORC module: 5MW
Hnjdpfevytfusx Amvot
Electrical output ORC module: 1.1MW
Fuel consumption approx. 9 loose cubic meters per hour (depending on fuel)
Dismantling must be carried out by the buyer.
Further information on request.
该广告为自动翻译,可能存在翻译错误。
供應商
注意: 免费注册或登录,以获取所有信息。
上次在线:上周
注册于: 2023
5 在线广告
发送询价
电话 & 传真
+43 5516 ... 广告
这些广告您可能也感兴趣。
小广告
Mouvaux
7,704 km
肉类加工机
Steriflow BarriquandAutoclave 1341
Steriflow BarriquandAutoclave 1341
小广告
Estavayer
7,693 km
红酒发酵罐厂
DEFRANCESCHI100 000 Liter
DEFRANCESCHI100 000 Liter
小广告
Geiselwind
7,301 km
远程控制夹紧车
WEISSVHF
WEISSVHF
小广告
Jõhvi
5,927 km
通板式钻孔机
HOMAGDRILLTEQ V-500
HOMAGDRILLTEQ V-500
小广告
Cremona
7,578 km
Howden TWIN CA46 1.6兆瓦蒸汽涡轮机
HowdenKK&K TWIN CA46
HowdenKK&K TWIN CA46
小广告
Cegléd
6,800 km
箱式干燥机
ScolariDryer
ScolariDryer
小广告
Neumarkt in der Oberpfalz
7,264 km
供暖系统
Heizkessel Fröling 1250kwHeizkessel Fröling
Heizkessel Fröling 1250kwHeizkessel Fröling
小广告
Berlin
6,991 km
芯片提取
Höcker PolytechnikK 40/400
Höcker PolytechnikK 40/400
小广告
Žatec 1
7,078 km
装配式仓库厂房 - 二手
小广告
Jonava
6,214 km
纸板堆垛机
Brettstapler
Brettstapler
您的广告已成功删除
发生错误