EV Car Motor Assembly and Testing Line (2021)
Cgodpfx Aiezhub Aeijw
Designed to produce EV motors in the power range of 180–300 kW
Including manual, semi-automated, and automated operations
Cycle time: 86s
Stations and Equipment
Component loading
- KUKA KR15 R2700-2/FLR robot (2021)
- Material infeed
- Inner housing heating with induction coil up to 240 °C
- Stator pressing into housing
- 1T TOX press
- Keyence CA-DQP25X
- Cooling tunnel
- Cooldown to 24 °C
- Cycle time: 600 s
X-ring and D-ring inner housing assembly
- X-ring and D-ring seal insertion into housing
- Dedicated round assembly tool available
Outer housing pre-assembly
- Flange screw into housing with Bosch Rexroth ESA013G-G0 screwdriver
- Automatic inner and outer housing joining
Outer housing assembly
- 3T TOX EQK 030 press
- 2x Cognex scanners
- 2x Keyence Camera V3
- 3x VS camera systems
Rotor magnetization and measurement
- Magnet magnetization
- MagSys magnetizer MC3K82 (2020)
- Magnetizing fixture MFFer8/160/250
A-shield pre-assembly and rotor insertion
- Rotor bearing and resolver pressing
- 3T TOX press
A-shield assembly into outer housing
- 1T TOX EQK press
- A-shield screwing into outer housing with pneumatic screwdriver (5 Nm)
Mounted component fastening
- Fastening with 4GE59 Rexroth screwdriver
- Manipulator system Handyflex 400
Inter-connector connection
- Manual mounting of inter-connector and insulating tube
Counter ring insertion, cooling cover, and vent assembly
- 3T TOX EQK 030 press
Rotor cooling cover mounting
- Screwing with 4 Nm
End-of-line (EOL) electrical testing loop
- 5x Deutronic testers, including:
- ETL ATS 400 high-voltage testers
- HIOKI RM3545 resistance testers
- Reilhofer EOL analyzers
Inter-connector disconnection station
- Disconnection of the inter-connector
- Insertion of 2 screws and screwing with Rexroth screwdriver (13 Nm)
- Manipulator system Handyflex 300
- Washer control
- Motor rotation
Leak testing
- 2x Leak test stations with Innomatec LTC-902 testers
- Vacuum and overpressure leak tests
- Tested quantity: approx. 50,000 pcs per test station
Rotation, laser marking, stamping, engraving, and inspection
- ADT stamping machine
- Arex Laser 450
- Keyence CA-H camera system
- Datalogic CBX 100 reader
- Tested quantity: approx. 130,000 pcs
Transportation protection
- Yellow transportation cover/cap and plug assembly
- Manual insertion of caps and hole securing
Packaging and final inspection
- Dalmec manipulator (2022)
Cgodpfx Aiezhub Aeijw
Designed to produce EV motors in the power range of 180–300 kW
Including manual, semi-automated, and automated operations
Cycle time: 86s
Stations and Equipment
Component loading
- KUKA KR15 R2700-2/FLR robot (2021)
- Material infeed
- Inner housing heating with induction coil up to 240 °C
- Stator pressing into housing
- 1T TOX press
- Keyence CA-DQP25X
- Cooling tunnel
- Cooldown to 24 °C
- Cycle time: 600 s
X-ring and D-ring inner housing assembly
- X-ring and D-ring seal insertion into housing
- Dedicated round assembly tool available
Outer housing pre-assembly
- Flange screw into housing with Bosch Rexroth ESA013G-G0 screwdriver
- Automatic inner and outer housing joining
Outer housing assembly
- 3T TOX EQK 030 press
- 2x Cognex scanners
- 2x Keyence Camera V3
- 3x VS camera systems
Rotor magnetization and measurement
- Magnet magnetization
- MagSys magnetizer MC3K82 (2020)
- Magnetizing fixture MFFer8/160/250
A-shield pre-assembly and rotor insertion
- Rotor bearing and resolver pressing
- 3T TOX press
A-shield assembly into outer housing
- 1T TOX EQK press
- A-shield screwing into outer housing with pneumatic screwdriver (5 Nm)
Mounted component fastening
- Fastening with 4GE59 Rexroth screwdriver
- Manipulator system Handyflex 400
Inter-connector connection
- Manual mounting of inter-connector and insulating tube
Counter ring insertion, cooling cover, and vent assembly
- 3T TOX EQK 030 press
Rotor cooling cover mounting
- Screwing with 4 Nm
End-of-line (EOL) electrical testing loop
- 5x Deutronic testers, including:
- ETL ATS 400 high-voltage testers
- HIOKI RM3545 resistance testers
- Reilhofer EOL analyzers
Inter-connector disconnection station
- Disconnection of the inter-connector
- Insertion of 2 screws and screwing with Rexroth screwdriver (13 Nm)
- Manipulator system Handyflex 300
- Washer control
- Motor rotation
Leak testing
- 2x Leak test stations with Innomatec LTC-902 testers
- Vacuum and overpressure leak tests
- Tested quantity: approx. 50,000 pcs per test station
Rotation, laser marking, stamping, engraving, and inspection
- ADT stamping machine
- Arex Laser 450
- Keyence CA-H camera system
- Datalogic CBX 100 reader
- Tested quantity: approx. 130,000 pcs
Transportation protection
- Yellow transportation cover/cap and plug assembly
- Manual insertion of caps and hole securing
Packaging and final inspection
- Dalmec manipulator (2022)