带精确控制的混合设备Mischanlage elktronisch gesteuert
带精确控制的混合设备
Mischanlage elktronisch gesteuert
VB 不含增值税
€38,500
出厂年份
2023
状况
二手
位置
Havelsee 

基本数据
价格和位置
VB 不含增值税
€38,500
- 位置:
- Havelsee, 德国

拨打
技术细节
进料托盘数量:
2
优惠详情
- 广告编号:
- A22368807
- 更新:
- 最近更新时间为 21.07.2026
描述
Scope of supply of the system
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Rodpfszmyvisx Akcoch
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
该广告为自动翻译,可能存在翻译错误。
The offer includes:
1. Mixer
• Concrete mixer with a capacity of 9 m³.
• Mixer screw inside the mixer has been renewed and reinforced.
• The mixer is driven by a powerful electric motor.
• The mixer is mounted on four load cells (each with a load capacity of 20 t) for precise weighing of the materials to be mixed.
2. Trough screw conveyor 1
• Conveying system for feeding the mixer.
3. Trough screw conveyor 2
• Conveying system for discharging the finished mixed material.
4. Liquid feed
• Dosing of liquid components via a pumping system from Flux.
5. Electronic control
• Electronic control with a mobile operating unit for weighing and dosing based on the weight increase of the material in the mixer.
Mode of operation
• The mixer is installed on load cells. The current material weight is displayed on the display at all times.
• For example, if a total mixture of 4,500 kg is to be produced, this can be dosed precisely according to a predefined mixing ratio, e.g. 80% main material (3,600 kg), 10% additive (450 kg), 7% additive (315 kg) and 3% additive (135 kg).
• The smaller additives are pre-weighed and fed into trough screw conveyor 1 via the additive hopper using a travelling carriage from big bags.
• Subsequently, the main material is conveyed into the mixer via trough screw conveyor 1 until the desired total weight of 4,500 kg is reached.
• After that, the feed is stopped via the trough screw conveyor.
• The mixing process then takes place according to the requirements. In our application, the mixing time was approximately 20 minutes.
• After the mixing process is complete, the material is discharged via trough screw conveyor 2. To do this, the direction of rotation of the drive motor is switched at the control panel and the discharge screw conveyor is switched on.
• The finished mixture can then be filled directly into containers or loaded into transport vehicles (in our case, a push-off trailer or manure spreader).
Rodpfszmyvisx Akcoch
Mixing process based on weight percentages
1. The main material is fed into the trough screw conveyor via the large stainless steel hopper, which then conveys the material into the mixer. In our case, this consisted of solid components from biogas waste.
2. Additional components can be added directly from big bags onto the main material using a second stainless steel hopper and a traverse. This ensures pre-mixing during the conveying process. In our application, biochar and bentonite were added.
3. Liquid components are sprayed directly into the mixer. In our case, we used EMa (activated effective microorganisms) for this purpose.
Optionally, the push-off trailer/manure spreader can be purchased.
该广告为自动翻译,可能存在翻译错误。
供應商
注意: 免费注册或登录,以获取所有信息。
注册于: 2021
1 在线广告
发送询价
电话 & 传真
+49 8191 ... 广告
这些广告您可能也感兴趣。
成功
您的消息已发送。
小广告
爱尔兰
8,198 km
托盘翻转机 / 托盘转向器
Premier Pallet InverterFS1900
Premier Pallet InverterFS1900
成功
您的消息已发送。
小广告
Wartenberg
7,274 km
双分数星屏
Anlagenbau GüntherMULTISTAR ONE / MS ONE
Anlagenbau GüntherMULTISTAR ONE / MS ONE
成功
您的消息已发送。
小广告
Berlin
6,991 km
双螺杆料斗
成功
您的消息已发送。
小广告
Gmunden
7,175 km
附件风筛
TUKWINDPRO 18
TUKWINDPRO 18
成功
您的消息已发送。
小广告
Bad Langensalza
7,222 km
院装载机
ManitouMLA 2-25 H
ManitouMLA 2-25 H
成功
您的消息已发送。
小广告
Sinsheim
7,429 km
使用过的犁铧搅拌机
MAPWBHP 15000
MAPWBHP 15000
成功
您的消息已发送。
小广告
Oberleichtersbach
7,318 km
筛分厂
Metso2PP 7000/2250
Metso2PP 7000/2250
成功
您的消息已发送。
小广告
Bad Salzungen
7,266 km
星形滤网 ESS
Butzer - EVRESS
Butzer - EVRESS
成功
您的消息已发送。
小广告
Polków-Sagały
6,454 km
托盘交换装置旋转
PREMIERV CHANGER
PREMIERV CHANGER
成功
您的消息已发送。
小广告
Dinkelscherben
7,368 km
起重磁铁块 永久磁铁
die magnetprofisPEM2000x850x200
die magnetprofisPEM2000x850x200
您的广告已成功删除
发生错误















































































