洁净室 ISO 8
洁净室 ISO 8
EXW VB 不含增值税
€50,000
出厂年份
2020
状况
二手
(完全功能)
位置
Łódź 

机器数据
价格和位置
EXW VB 不含增值税
€50,000
- 位置:
- Łódź, 波兰

拨打
优惠详情
- 广告编号:
- A14477200
- 更新:
- 最近更新时间为 02.01.2024
描述
CLEANROOM - ISO 8
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Iijdpfx Asq H H Rujbyjf
该广告为自动翻译,可能存在翻译错误。
| Cleanroom requirements ISO Class 8 | ISO Cleanroom Class 8 | Cleanroom classification.
In order to achieve an ISO 8 air purity class in a Cleanroom, several levels of air filtration are usually used (e.g. G4 pre-filter, F9 filter, H13 final filter). Air movement in the room is non-unidirectional (there is a mixing of "clean" air supplied to the room with "dirty" air present in the room). Air vents in the ISO 8 room are placed on the walls. The required number of air exchanges per hour will depend on the nature of the activities conducted in the room and the number of personnel present, but the goal could be to provide 10-40 air exchanges/hr. In ISO Class 8, personnel are often present continuously. Employees may be dressed in standard work attire and visitors in a disposable apron. It is recommended to maintain a minimum overpressure of the room relative to the adjacent zone of 5-10 Pa.
Requirements for equipment and materials intended for Clean Room with ISO air cleanliness class 8 (maximum average amount of particles released when: number of samples taken = 100; measurement performed in accordance with ISO 14644-14 in a cleanliness class at least one better than the purpose of the device; number of particles/m3) Detailed description in photos.
Technical drawings attached to photos.
Description of ventilation
The purpose of the ventilation installation performed was to achieve the following air parameters in the Clean Room. The installation was made with the GBD PHARMA 2000 system, meeting all the requirements for 'clean rooms' in the highest classes of air purity.
Parameters for the installation: a. Air purity - ISO 8. b. Temperature 19-23 st C
c. Humidity max 38%.
a. To ensure the required purity of the supplied air, an air handling unit manufactured by DOSPEL with a maximum capacity of V= 3500 m3/h [up to 15 air changes per hour] was used. The air handling unit is equipped with pocket filters : pre-filters FK EU5/EC2 and fine filters FK-EU9/EC2. In addition, HEPA 11 filters made by EUFILTER were used in diffusers located in the ceiling. Data sheets in point H6.
As a result , with a measured flow rate of 3264 m3/h, an ISO 7 [class "C"] cleanliness class of the room was obtained in the resting state, and thus an ISO 8 [class "D" ] cleanliness class for the working state.
b. The temperature range of 19-23 deg C is for the enlarged cooler and chiller to be freely maintained with 25% fresh air.
c. In order to achieve in summer conditions with high temperatures of 30 deg C and humidity of 80%, a freon chiller of 31.4 kW and a chiller of 33.5 kW of cooling power were used. The chiller is made by FUJITSU supplied by Klimatherm Gdansk.
The room is automatically regulated overpressure in relation to the external pressure - the pressure difference at the door : 15 Pa
The automation of ventilation allows for "economical" mode , in which the installation works in a closed circuit and an overpressure of 15 Pa is maintained.
Technical data attached to the photos.
Iijdpfx Asq H H Rujbyjf
该广告为自动翻译,可能存在翻译错误。
供應商
注意: 免费注册或登录,以获取所有信息。
注册于: 2023
1 在线广告
发送询价
电话 & 传真
+48 728 4... 广告
这些广告您可能也感兴趣。
拍卖
结束于
d
h
min
s
拍卖已结束
Hessen
7,372 km
电动叉车
ToyotaTraigo 48 8FBE20T
ToyotaTraigo 48 8FBE20T
小广告
Thisted
7,049 km
牛奶和乳制品生产
APVType PCI-UF 50-100
APVType PCI-UF 50-100
拍卖
结束于
d
h
min
s
拍卖已结束
Hessen
7,372 km
5吨叉车
Toyota40-8FD50N
Toyota40-8FD50N
拍卖
结束于
d
h
min
s
拍卖已结束
Brandenburg
7,026 km
龙门铣床
GRIMMEG-DT-F 12/10 SB
GRIMMEG-DT-F 12/10 SB
小广告
Bátonyterenye
6,762 km
纸箱生产机械
HGHYEGG TRAY
HGHYEGG TRAY
拍卖
结束于
d
h
min
s
拍卖已结束
Brandenburg
7,026 km
通用加工中心
Hamuel ReichenbacherECO-RS III-Duo
Hamuel ReichenbacherECO-RS III-Duo
拍卖
结束于
d
h
min
s
拍卖已结束
Niederösterreich
6,965 km
激光切割机
TRUMPFTRUMATIC L3030
TRUMPFTRUMATIC L3030
小广告
Enschede
7,394 km
管材激光切割机
Bodor K2
Bodor K2
拍卖
结束于
d
h
min
s
拍卖已结束
Nordrhein-Westfalen
7,499 km
工艺装置
FrymaMZM / VK 50
FrymaMZM / VK 50
拍卖
结束于
d
h
min
s
拍卖已结束
Nordrhein-Westfalen
7,499 km
冷冻干燥设备
ChristEpsilon 2-12 D
ChristEpsilon 2-12 D
小广告
Hradec Králové
6,936 km
切菜机
Urschel1700
Urschel1700
拍卖
结束于
d
h
min
s
拍卖已结束
Bayern
7,264 km
三坐标测量机
HexagonRA Romer Absolute 7525-1393-FA
HexagonRA Romer Absolute 7525-1393-FA
拍卖
结束于
d
h
min
s
拍卖已结束
Aragon
8,527 km
卧式加工中心
MORI SEIKINHX 4000
MORI SEIKINHX 4000
小广告
Wuppertal
7,431 km
点胶机
HESSMERT160 EST
HESSMERT160 EST
拍卖
结束于
d
h
min
s
拍卖已结束
Kauno apskritis
6,244 km
配备4台机器的自动封边生产线
HOMAGKAL Profi 330+KAL Profi 370+Profi TBL100
HOMAGKAL Profi 330+KAL Profi 370+Profi TBL100
您的广告已成功删除
发生错误






















































































































































































































































