群体推车炉
Keramischer Ofenbau HWO 1/9-5.2

EXW VB 不含增值税
€420,000
出厂年份
2003
状况
二手 (完全功能)
位置
Wesel 德国
群体推车炉 Keramischer Ofenbau HWO 1/9-5.2
群体推车炉 Keramischer Ofenbau HWO 1/9-5.2
群体推车炉 Keramischer Ofenbau HWO 1/9-5.2
群体推车炉 Keramischer Ofenbau HWO 1/9-5.2
群体推车炉 Keramischer Ofenbau HWO 1/9-5.2
群体推车炉 Keramischer Ofenbau HWO 1/9-5.2
more Images
Keramischer Ofenbau HWO 1/9-5.2
Keramischer Ofenbau HWO 1/9-5.2
Keramischer Ofenbau HWO 1/9-5.2
Keramischer Ofenbau HWO 1/9-5.2
Keramischer Ofenbau HWO 1/9-5.2
Keramischer Ofenbau HWO 1/9-5.2

机器数据

机器名称:
群体推车炉
制造商:
Keramischer Ofenbau
型号:
HWO 1/9-5.2
机器编号:
HWO 1/9-5.2​
出厂年份:
2003
状况:
二手
功能性:
完全功能

价格和位置

EXW VB 不含增值税
€420,000
位置:
Abelstraße 12, 46483 Wesel, Deutschland 德国
拨打

优惠详情

广告编号:
A22572597
参考编号:
HWO2
更新:
最近更新时间为 18.08.2026

描述

- The system is located at the Geberit Keramik GmbH site in Wesel.
- The system, including the associated safety technology, performs technical flash firing and re-firing and is prepared for this purpose.

- Maximum firing temperature [°C] = 1300
- Current operating temperature [°C] = 1238
- Number of burner groups = 10
- Number of burners = 38
- Number of kiln cars = 18
- Number of kiln cars in the kiln = 9
- Current firing cycle [h] = 17 - 23
- Gross energy consumption [kcal/kg] / [kWh/kg] = 785 / 0.912
- Specific energy consumption [kcal/kg] / [kWh/kg] = 1459 / 1.696
- Gas connection capacity [m³/h] = 770
- Usable waste heat [m³/h] = 4000
- Standard loading quantity [pieces] = 900-980 ceramic products

Dimensions of the housing:
- Length [m] = 14.4
- Width [m] = 6.4
- Height [m] = 5.7
- Volume density [m³] = 146.3

Dimensions of the kiln car:
- Effective length [m] = 1.45
- Effective width [m] = 5.2
- Effective height [m] = 2.156
- Track gauge [m] = 1.5 (2x)

Special features:
In 2023, the kiln was completely overhauled and brought up to the latest state of the art.
The following changes were made:
Isdpfszu Nvzex Abyoif
- Renewal of the kiln roof: The fiber lining in the upper area was replaced with cordierite stones.
- Renewal of the burners, including new nozzles, flame tubes and controllers.
- Replacement of the media valves; installation of servo motors on the gas and air lines in front of the burners.
- Installation of new software; the Simatec control panel was replaced – control is now exclusively via the PC.
- Replacement of the O₂ control system; installation of a Zerox probe; installation of an O₂ analyzer for O₂ correction (to improve energy efficiency by approximately 12–14 %).

- The system must be dismantled, packed and collected independently by the buyer.

该广告为自动翻译,可能存在翻译错误。

供應商

上次在线:上周

注册于: 2026

1 在线广告

拨打

发送询价

土地us 
德国
奥地利
瑞士
美国
联合王国
法国
比利时
西班牙
墨西哥
意大利
荷兰
波兰
俄罗斯联邦
白俄罗斯(白俄罗斯共和国)
乌克兰
爱沙尼亚
土耳其
新西兰
爱尔兰
捷克共和国
丹麦
芬兰
瑞典
挪威
卢森堡
希腊
立陶宛
拉脱维亚
冰岛
葡萄牙
巴西
委内瑞拉
阿根廷
匈牙利
斯洛伐克
罗马尼亚
摩尔多瓦
斯洛文尼亚
塞尔维亚
黑山
阿尔巴尼亚
克罗地亚
保加利亚
北马其顿
波斯尼亚和黑塞哥维那
以色列
埃及
摩洛哥
印度
印度尼西亚
韩国
日本
泰国
马来西亚
越南
中国,中华人民共和国
中国台湾
伊朗
孟加拉国
提示: 您的请求将被转发给该机械类别的所有卖家。 这样您可以收到大量的报价。
无法发送请求。请稍后再试。

电话 & 传真

+49 1515 ... 广告